It is a 23-MW biomass cogeneration plant at the Kruger paper mill in Bromptonville. The plant includes a hog boiler that burns paper mill sludge, bark and other wood waste, and a steam turbine that, in addition to providing the steam needed to dry the paper, generates electricity.
LNA was responsible of the construction management activities for the installation of the boiler and the turbo generator, including the following services:
- Constructability review and construction optimization
- Construction daily progress
- Construction planning
- Engineering coordination
- Site safety
- Supplier erection coordination
- Systems start-up planning
- Preparation and analysis of claims