The Seigneurie de Beaupré Wind Farms, with a total contracted capacity of 365 MW, are as of today the largest wind power project in development in Canada. It is located in Lac Jacques Cartier unorganized territory, Quebec, at an altitude of 1000 metres (328 feet) which is covered with snow from mid-October to mid-May.
The construction of Phase II (also called wind farm #4), comprising 28 Enercon turbines, with a total capacity of 68 MW, where LNA was in charge of all the construction activities for the entire site, including the management of civil engineering works, erection of the towers, assembly of the turbines and management of electrical equipment for commissioning.