Under the Phase 1 of the Consolidated Thompson project, a complete port infrastructure was required for receiving and loading the processing plant concentrate: Port installation, railway, load-out station, stacker /reclaimer, conveyor system and ship loader.
LNA WAS RESPONSIBLE FOR:
- Managing the take over control of the new port facilities at Pointe Noire, the existing construction management was put under control and the direction of LNA to achieve new dates for operating the Port Loading Facilities.
- Construction Management and Project Control of all activities planned for unloading, storage, recuperation, conveying, ships loading, the Pointe-Noire railway and the Arnaud junction, including works for field management, planning, coordination and contracts administration.
- Preparation of Construction Estimates for Phase 2.
- Preparation of claims and counter claims.
- Litigation technical support
- Expert’s report